Analysis of Advanced Process Control for Grinding
Johannes Sikström, Senior Development Engineer, Boliden
The most energy-intensive step in a mineral concentration plant is grinding, in some cases 40% – 50% of the total site consumption. Optimizing the grinding operations has the most impact in power consumption and mill throughput. Seeq was used to perform analysis of the mill power utilization in Boliden Garpenberg to identify the potential and then the performance of a new advanced process control system. The results of the assessment and early evaluation will be presented here.
Conneqt 2023 – Materials & Power
-
1
21:11Analysis of Advanced Process Control for Grinding
-
2
25:22Advanced Analytics for Power Generation
-
3
20:50NITROcrete – “Hands-Off” Approach for Using Seeq to Manage its Business
-
4
32:25Ontario Power Generation- How Seeq Enables OPG’s M&D Centre
-
5
16:05Birla Carbon – Collaboration & Accelerated Insight to Create Value